MotorSeven
Addicted to ArboristSite
It's a 2000 model that hadn't been started in 5 years. I didn't even have to take the carb off, just hose it down with carb cleaned and it fired up......I am already liking the Kohler 15 horse
I threw a poplar log on the mill & did some cutting, wow this thing flys compared to my CSM. In the current configuration it will only cut out to 11+ feet. Woodmizer wants $629 per 6'8" extension plus shipping, which would be over $1300 as I need two. I stopped by the steel yard and ordered all the steel to build one 16' extension......$388. This will give me a 27' cut length capacity, so my house rafters will be no problem.
I also formed up a 9'x27' pad & will pour a slab today for the mill. Then my first order of business is to build a shed over the mill....well, er ah, after I milll some lumber and build the wife some flower boxes......:chatter:
The Woodbug CSM goes on fleabay this week, so I hope to get some $ back to put towards the LT15.
RD
I threw a poplar log on the mill & did some cutting, wow this thing flys compared to my CSM. In the current configuration it will only cut out to 11+ feet. Woodmizer wants $629 per 6'8" extension plus shipping, which would be over $1300 as I need two. I stopped by the steel yard and ordered all the steel to build one 16' extension......$388. This will give me a 27' cut length capacity, so my house rafters will be no problem.
I also formed up a 9'x27' pad & will pour a slab today for the mill. Then my first order of business is to build a shed over the mill....well, er ah, after I milll some lumber and build the wife some flower boxes......:chatter:
The Woodbug CSM goes on fleabay this week, so I hope to get some $ back to put towards the LT15.
RD