hood river
ArboristSite Lurker
I see lots of threads for all the Hutzl/Farmertec saws, but I haven't seen anyone put together a complete Ms 250.
Anyone have any experience with the Chinese Cylinder? I did see a nice meteor nikasil set for $130 though
I priced one today $150-175, but that changes from time to time and I might have 10% of an order too...so I might be able to get all the parts on my doorstep for less than $150 with cheap b/c to boot....
I do have a couple older, well working 250s and I also have an offer to piece together another 10 hulks in various states of disrepair.... as a favor for a outdoor charity. My thoughts are to build a complete 250 from all AF parts and see what works, what doesnt....
Eventually I am going to need to replace a few things on my own workings saws when the times comes and for this possibility of helping out this charity too...it also gives me a platform to gain a little experience....I can tune a saw carb and replace most of the ancillary components, so I feel this is a good progression.....
Haven't really ventured into 2 stroke building yet, but I have good working background in engine building in general....
Could this be fun and worthwhile or a friggin nightmare?
Thanks y'all.
Anyone have any experience with the Chinese Cylinder? I did see a nice meteor nikasil set for $130 though
I priced one today $150-175, but that changes from time to time and I might have 10% of an order too...so I might be able to get all the parts on my doorstep for less than $150 with cheap b/c to boot....
I do have a couple older, well working 250s and I also have an offer to piece together another 10 hulks in various states of disrepair.... as a favor for a outdoor charity. My thoughts are to build a complete 250 from all AF parts and see what works, what doesnt....
Eventually I am going to need to replace a few things on my own workings saws when the times comes and for this possibility of helping out this charity too...it also gives me a platform to gain a little experience....I can tune a saw carb and replace most of the ancillary components, so I feel this is a good progression.....
Haven't really ventured into 2 stroke building yet, but I have good working background in engine building in general....
Could this be fun and worthwhile or a friggin nightmare?
Thanks y'all.