Just made and purchased all parts needed to put lift on bandit 250.
Will work on bandit 150 200 250
Need
2x12 dual port cylinder 100
Energy 10228 control valve 100
Frame 1/2 plate 4inch wide upper
Base 3/8 plate
Lift block 3x5 x1 1 inch hole in center
Will need fitting
2 for cylinder oring style
2 for control valve in out main flow
3/4 male pipe x 1/2 female pipe swivel 90°
2 90° jic to pipe elbow 2501-08-08 work ports 1/2
Custom hoses by where and how you mount valve and main flow by year of machine
Will give measurements for frame made from template from machine I coppied from.
Will work on bandit 150 200 250
Need
2x12 dual port cylinder 100
Energy 10228 control valve 100
Frame 1/2 plate 4inch wide upper
Base 3/8 plate
Lift block 3x5 x1 1 inch hole in center
Will need fitting
2 for cylinder oring style
2 for control valve in out main flow
3/4 male pipe x 1/2 female pipe swivel 90°
2 90° jic to pipe elbow 2501-08-08 work ports 1/2
Custom hoses by where and how you mount valve and main flow by year of machine
Will give measurements for frame made from template from machine I coppied from.