Hey all,
Getting back into tree work after a several year hiatus and have a question about hitch cord length for my Ddrt set up. I’d like to use it with a tending pulley, but am unsure of how long to order it. I would prefer spliced or an eye to eye as opposed to buying a rope and making my own. I’m looking at a foot locking eye to eye Prusik Cord from bee line that’s 50” in length. Does this sound about right to you guys or could someone recommend something specific ?
I guess my question is how far do you want the friction hitch from the bridge of your saddle? It seems like once you double a 32 inch eye to eye, you’re at 16 inches, minus the length taken by the actual tying of the hitch. Will an anchor hitch for my main leg of the line and 2 eye splices for the tail end even fit on one carabiner on my bridge? Would I be better off using a split tail so I’d only have the anchor hitch and one eye on the carabiner?
Thanks,
Dustin
Getting back into tree work after a several year hiatus and have a question about hitch cord length for my Ddrt set up. I’d like to use it with a tending pulley, but am unsure of how long to order it. I would prefer spliced or an eye to eye as opposed to buying a rope and making my own. I’m looking at a foot locking eye to eye Prusik Cord from bee line that’s 50” in length. Does this sound about right to you guys or could someone recommend something specific ?
I guess my question is how far do you want the friction hitch from the bridge of your saddle? It seems like once you double a 32 inch eye to eye, you’re at 16 inches, minus the length taken by the actual tying of the hitch. Will an anchor hitch for my main leg of the line and 2 eye splices for the tail end even fit on one carabiner on my bridge? Would I be better off using a split tail so I’d only have the anchor hitch and one eye on the carabiner?
Thanks,
Dustin