unclejoe
ArboristSite Lurker
Well I'm almost ready to put the new unit in service. a lot of work but well worth it. just a roof is needed andit will all be over.
Well I'm almost ready to put the new unit in service. a lot of work but well worth it. just a roof is needed andit will all be over.
Well I'm almost ready to put the new unit in service. a lot of work but well worth it. just a roof is needed andit will all be over.
I could fit a 48 inch log into mine.. But even small limbs are a booger to load that way. I cut my wood 20 inches long and load it crossways in the firebox instead of the traditional way. Me and that conveyor system would be fighting on the first time I tried to use it.. with smoke billowing out into my face.
But to each their own I suppose.
Nice setup. How much did the 4 pressure treat poles cost you?