Mitchell
ArboristSite Operative
few pic sof a job I did the other day. 2 hours and no pay argh... How would you folks tackle this...
No access for machines. I sucked up 40' on my 9/16 line before i even started to apply pull. Im guessing cable or a static line would have helped. I have a 3g come along I should have tried on a direct pull. Also, the stump was leaning 20 degrees away from pull direction. I messed around with different things but my when prussics started to fail and slip I had to admit defeat... I was out of time and they were not to worried about it anyways.
No access for machines. I sucked up 40' on my 9/16 line before i even started to apply pull. Im guessing cable or a static line would have helped. I have a 3g come along I should have tried on a direct pull. Also, the stump was leaning 20 degrees away from pull direction. I messed around with different things but my when prussics started to fail and slip I had to admit defeat... I was out of time and they were not to worried about it anyways.
Last edited: