burningwood
ArboristSite Operative
View attachment 197096
Once we get finished with the Hemlock, should be Saturday afternoon, the above is next on the list. I have the long weekend off so we should get some board feet done.
bw
Once we get finished with the Hemlock, should be Saturday afternoon, the above is next on the list. I have the long weekend off so we should get some board feet done.
bw