Wonder how it would work as a chip truck

Arborist Forum

Help Support Arborist Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
This was even bigger, taken at the Kennedy Space Centre last month-crawler that delivers the shuttle to the pad, originally used for the Saturn V Apollo rocket as well. "Large equipment" if nothing else
 
We are changing the dump boxes on twenty something of our fleet over the next couple of months-my job to get rid of the scrap, 100,000 lbs worth per truck, and given today's price for scrap, about $10,000 ea.
 
Payload 400 tons.

Here's the stump grinder to go with that truck:

bigdigger.jpg
 
ya but if we filled it with chips the payload would only be about 56 tons :dizzy: or we could put real big sides on it as 400 tons would be about 2,080 yards
 
Last edited:
ya but if we filled it with chips the payload would only be about 56 tons :dizzy: or we could put real big sides on it as 400 tons would be about 2,080 yards


Now you are thinking! All we would need is about 800 sheets of plywood and about 400 2x4s to box her up.
 

Latest posts

Back
Top