I have lots of work in the back part of my property. I started yesterday. I just finished my 038 mag and I had to test it. A big oak lost a limb and that’s the was the plan for my bridge. Cut to about 9’ pieces, not easy to get into place solo but I made it happen. Also started some trail clearing. While digging around I found an old 2 ton truck wheel, turned that into my temporary firepit. That whole area also need about 6 yards of fill but that’s another story.