- Joined
- Apr 28, 2014
- Messages
- 7,785
- Reaction score
- 10,443
The snow is slowly melting away, and some logs from last year are starting to appear.
I mounted up a well used 20" B&C for my 1st Phase of the break in.
1) Idle for a couple of minutes
2) 2 cuts
3) Let it cool for 30+ minutes
4) Idle for a couple of minutes
5) Another 5 cuts.
For tomorrow I mounted the 24" B&C (Sqr Ground skip tooth) and have another log rolled up atop some quickly made ramps. I'll do as many cuts as this log require, and IMO this saw is then ready for serious work.
I have another 4 or 5 logs still under a good amount of snow, and once I can free them up, I will do the same with the 500i.





I mounted up a well used 20" B&C for my 1st Phase of the break in.
1) Idle for a couple of minutes
2) 2 cuts
3) Let it cool for 30+ minutes
4) Idle for a couple of minutes
5) Another 5 cuts.
For tomorrow I mounted the 24" B&C (Sqr Ground skip tooth) and have another log rolled up atop some quickly made ramps. I'll do as many cuts as this log require, and IMO this saw is then ready for serious work.
I have another 4 or 5 logs still under a good amount of snow, and once I can free them up, I will do the same with the 500i.




