The aluminum walk board was a temporary fixture to help determine how high to make the walk way for the saw operators. We decided 14-16" would work well so I will be making 2 boxes 7' long to store equipment in which will double as the walkway.
This last picture shows some of the larger rounds cut but not the largest.
It was kind of funny, the first thing Hedgerow said to me when we got to the cutting site was, "I guess the pile is larger than I thought it was."
We oriented the trailer & splitters to where the splits could be tossed into the lean to. We quickly realized our mistake. The wind blew saw chips into our faces. We stuck it out but you better believe we will plan it better for the Mansfield cut, April 4th & 5th.
A pile of logs, one saw operator & a good loader operator is able to supply round for 3 splitting crews. However it will take several saw operators to produce the pile of logs.
Even though the trailer made it much easier on backs, I still think we all went home tuckered out.
It was a great day! A few sprinkles but over all nice weather.