I do hope to have at least some parts ready for the Iowa Spring GTG 26/27 April. I doubt the shop will be fully fitted out and I know my parts and parts saws will not be relocated by then.
Here are some photos of the insulation completed in the shop area...other parts require an additional visit from the insulations crew.
I will be locating my machine tools (lathe, mill/drill, surface grinder) and welding bench along this wall so I have 220v outlets as well as 110v outlets along this wall.
You can just see some of the open cell foam on the bottom of the roof in this one, mostly you see the bottom side of the decking in the attic. The overhead airline will (hopefully) be strategically located over my walkaround workbench.
Mark
Here are some photos of the insulation completed in the shop area...other parts require an additional visit from the insulations crew.
I will be locating my machine tools (lathe, mill/drill, surface grinder) and welding bench along this wall so I have 220v outlets as well as 110v outlets along this wall.
You can just see some of the open cell foam on the bottom of the roof in this one, mostly you see the bottom side of the decking in the attic. The overhead airline will (hopefully) be strategically located over my walkaround workbench.
Mark