We started out by making concrete forms out of 3/4" ply wood. Next we dug ledges on the creek bank 24" deep by 18" wide 8' long.
We set the forms leveled and squared them with each other.
Pulled the forms back out and drilled 8" holes another 48" into the ground to attempt to get past the frost level. reset the forms added 1/2" re-rod and wire mesh.
We made the forms to hold the Bar joists. I got the bar joists used. They are from a local mall. They where used as floor joists for a 2nd floor in a warehouse. I had them sprayed with primer at the local steel yard. Then I painted them with oil based implement paint.
We then mixed and poured 6,000 pounds of concrete one bag at a time Let that set up for several weeks. Then bolted 2x6 stringers to the top of the joists and used 2x8 for decking. It is 7'wide by 23' long It was a lot of work....
[/IMG]