now when you get to #9 and figure you have enough ? double it and have a start for next year! ...the rest of November is to be about the same as the first week ! cut, cut, cut then haul till it snows.... lolload 8 out!
mostly oak.
Brian
no kidding, I am going to keep going and see if I can get ahead.now when you get to #9 and figure you have enough ? double it and have a start for next year! ...the rest of November is to be about the same as the first week ! cut, cut, cut then haul till it snows.... lol
That's a good size lean-to. What size are those structural members under that metal roof? 2x8? It'd be too little up here with our snow loads. you'd need 2x12 here I think and probably at least one more post in between in each direction and in center. And we'd need a permit to build it too...lol.Almost have it all under roof. Hope to have it all finished tomorrow if the rain holds off. Then it's time to start stacking!
Sent from my iPhone using Tapatalk
That's a good size lean-to. What size are those structural members under that metal roof? 2x8? It'd be too little up here with our snow loads. you'd need 2x12 here I think and probably at least one more post in between in each direction and in center. And we'd need a permit to build it too...lol.
You're right it's 3 cordwhere's the other 17 cords?
While on holiday I got the itch.. so at the holiday house I cut up what I had at hand. Found a large amount of someones milling attempts in the forest so home they came with me. View attachment 536796 View attachment 536797 View attachment 536798
Wow, firewood catacombs. I reckon @zogger would love what you've done with that place.
Enter your email address to join: