now when you get to #9 and figure you have enough ? double it and have a start for next year! ...the rest of November is to be about the same as the first week ! cut, cut, cut then haul till it snows.... lolload 8 out!
![]()
![]()
mostly oak.
Brian
no kidding, I am going to keep going and see if I can get ahead.now when you get to #9 and figure you have enough ? double it and have a start for next year! ...the rest of November is to be about the same as the first week ! cut, cut, cut then haul till it snows.... lol
That's a good size lean-to. What size are those structural members under that metal roof? 2x8? It'd be too little up here with our snow loads. you'd need 2x12 here I think and probably at least one more post in between in each direction and in center. And we'd need a permit to build it too...lol.Almost have it all under roof. Hope to have it all finished tomorrow if the rain holds off. Then it's time to start stacking!
![]()
Sent from my iPhone using Tapatalk
That's a good size lean-to. What size are those structural members under that metal roof? 2x8? It'd be too little up here with our snow loads. you'd need 2x12 here I think and probably at least one more post in between in each direction and in center. And we'd need a permit to build it too...lol.
You're right it's 3 cordwhere's the other 17 cords?
While on holiday I got the itch.. so at the holiday house I cut up what I had at hand. Found a large amount of someones milling attempts in the forest so home they came with me. View attachment 536796 View attachment 536797 View attachment 536798
Wow, firewood catacombs. I reckon @zogger would love what you've done with that place.