CaptainCarabiner
New Member
I feel as though I'm missing something here. I've used two tie in points many times (double crotch), only with two separate systems. Could someone explain to me or show a diagram of the proper way to tie off twice with one line? Would I take the standing end of line run it through my anchor point then back to saddle and tie off?