Well it took just under 2 1/2 hours to take these 2 saws and make one running good one. It was the last project saw i had left of 4 for this winter.
Got 3 5000's in the mail coming my way though, so it want be long to start on some more soon, or this could be along winter if we get snow like Denver did. it is alive and 2 free bad saws made one runner. Had to do a heart transplant. Also one had a zama carb and one a walbro carb, had to change the throttle linkages around to run the walbro on the red saw. But I like walbros.
Scottr, The only trouble is I haven't got the bar oil primer going yet. Clues?
Got 3 5000's in the mail coming my way though, so it want be long to start on some more soon, or this could be along winter if we get snow like Denver did. it is alive and 2 free bad saws made one runner. Had to do a heart transplant. Also one had a zama carb and one a walbro carb, had to change the throttle linkages around to run the walbro on the red saw. But I like walbros.
Scottr, The only trouble is I haven't got the bar oil primer going yet. Clues?
Last edited: