O i can see it now, he is missing his carpenter belt and a sawzall. i was on that job and the co made him climb the tree 3x. the first climb he had to gut thin untill the poor ol tree was empty, than later the boss talked the ho into thinking the tree needed to come down because it was too big. than the boss made me run up and hack off some big limbs just to make sure we got the job. the next day i pruned her to the stump. i hate to admit thats me for many reasons and im sad to see such a nice healthy tree get destroyed for no good reason. i hate to hack but where i work its my job. the tree was a easy 90+ feet with two big healthy codom stems. the tree had to come down small and lots of ropin to avoid many obsticles. we had no biz f-in up such a nice treethe bos did it all for a grand. stump and wood included. it was 4hrs comming down. the chips filled 1-1/2 full truck loads and the wood was almost 4 fully stacked loads in our new big truck. 4 man crew 1-1/2 days. saftey gear is not required were i work so i often leave it in the truck. sorry for showing a poor example on this great site. im even more sorry about all the nice trees we f-up.i refuse to admit i work like that. its not me. heck im just a cable guy
your boss is working for peanuts. a grand??? what kinda profit to do you think he made after expenses? Maybe $200?