my last crane job I planned for 7 hours, ended up taking 2 days...Also take your time don’t be in a rush if an hr or two breaks the bank on the crane then you should not have it there in the first place.
Should I ask how you know this, LOL?It’s like a bullet once you make the cut there is no way out if it’s to heavy just remember that.
Youtube.comShould I ask how you know this, LOL?
oh he's an operator and has half a brain, anybody can figure out that if something is too heavy, its too heavy, doesn't take an Einstein to figure out that tree work and cranes are a very sketchy combo if anything goes even a little wrongYoutube.com
All those picks are 1000000% bad do you know why? It involves the shackle this is a learning question btw. Also there is fine line between his call and yours! The climber is the boss within reason point blank it’s always your call unless it pertains to his capacity or machine. You think he would take accountability if something DID go wrong ? Just a thoughtoverflowed their drip tray and bucket before we got the boom put away!
yes im aware that shackle is side loaded, the operator gave me 2" slings with 1/2" shackles and the slings wouldn't fit around the pins properly, he didn't mind it and we weren't close to capacity for any rigging... his call not mine
View attachment 1171938View attachment 1171944View attachment 1171943View attachment 1171942View attachment 1171941
All those picks are 1000000% bad do you know why? It involves the shackle.
yes im aware that shackle is side loaded, the operator gave me 2" slings with 1/2" shackles and the slings wouldn't fit around the pins properly, he didn't mind it and we weren't close to capacity for any rigging... his call not mine
I’ve never been on the bad side of this but have seen others that have.Should I ask how you know this, LOL?
It’s not the shackle its YOUR rigging with the shackle. But I’m sensing you know all.Did ya read the message I posted above where that's what the operator told me to use? His insurance requires he use his rigging, cant argue with him on that
Yeah that as well lolYoutube.com
the sling wouldn't fit where its supposed to within the shackle, I know full well how to use one, these are a SUPER thick 2" wide nylon sling with almost zero flexibility and will not fit around the pin as it should, that size shackle is for a 1" sling or a round endless loop, not a 2" web slingIt’s not the shackle its YOUR rigging with the shackle. But I’m sensing you know all.
let me guess, the twist?It’s not the side load either that’s bad yes but there’s another issue with that setup.
Nope you really don’t know?let me guess, the twist?
I appreciate it, I know it don't sound like it, but I do, if I don't see whats wrong, please do tell me, I seriously don't see anything else wrongBtw this is not me being an ass this is me genuinely caring for you and others
Don’t know if this is direct towards me but I don’t run my own crane and climb at the same time… just sayingoh he's an operator and has half a brain, anybody can figure out that if something is too heavy, its too heavy, doesn't take an Einstein to figure out that tree work and cranes are a very sketchy combo if anything goes even a little wrong
directed at genxerDon’t know if this is direct towards me but I don’t run my own crane and climb at the same time… just saying
Enter your email address to join: