I have thought of something similar.
Like you said though,not repeatable ,and not very safe if climbing down from the spar that has a chunk ready to drop at any second.
Could work if there was another tree in wich to rig climb line and a lift line from.
Just re-tie after each drop,then replace it back on the spar hook it back to limb line with poty ,and just reach over and tip it over,repeat as needed.
Bucket with material handler,and 40 ft spar would work good I suppose.
Spar and chunk would need to be spring pole like in order to get the point accross.
Let them learn to catch pc with minimum movement of spar.