sawbones
Addicted to ArboristSite
Well Ric I guess you did not look at the tag. I assume you do understand how elctricity works. The voltage is just one measurement. There are many factors to consider. I take 50,000 volt hits all the time with no issues. The 50,000 volts I get is at a low amperage so it is just a good shock. I weld at 200 amps with no issues as it is at a low voltage (well under 60 volts). I as well as everyone else feel nothing. There are many issues :Ohm's law does not differ
Look at the tag again.
Did you see the 400cyl??
You do realize we use 60cyl in the USA.
The generator is a specific application unit but is still a neat item to find
yes I tried to look at that tag but I am not really sure what cycles translate to for voltage.
believe it or not I have had dozens of gensets over the years up to 60 kw
but I really dont understand electricity that well.
I have freinds that will rewire them for me when I do the 3 phase to single phase conversions.
I have bought a lot of GI surplus stuff and know they use current that wont match ours.
was hoping that some smart army guy would jump in here and explain it better.