G'day fellers,
Not sure if I'm allowed to post this on the 'other stuff' thread but I went back out to the Monstromint this arvo. Got there to find wood had been moved around, including the multi-stem chunk I took a pic of last week.
View attachment 1083551
Today, it and several other logs had been separated from the branch material and laid out.
View attachment 1083552
I figured the farmer (Bandy) had done it and got started. Then he came by to see how I was going and told me that one of the farmers down the road had asked him who was doing all that cutting by his place. Bandy told him and the other chap (Gary - a previous client of mine) said he'd come up and pull some stuff out to make it easier for me. Great bloke!
So that multi-stem, once disassembled, almost filled (OVERLOADED) the trailer. I failed to take a pic before starting the OVERLOADING but here's the rest.
View attachment 1083553
There were a fair few splittables but quite a lot of noodleables, uglies and downright unmentionables but it all burns. I sliced up a few of the other logs too.
View attachment 1083554
So, ended up with this in the trailer
View attachment 1083555
And this in the ute
View attachment 1083556
So far that is 7 trips for about 17.5 cubes and there is at least another trip-worth there, maybe a bit more. It's going to end up being a 20+ cube tree. That's over 5 cord, comfortably the biggest tree I have ever scrounged.
Scrounge on