Well here she be in action! Hope you like it. Works well beyond expectation. Now for the cost side of the deal.
Used commercial grade treadmule -$300
steel tubing(new), wood and MISC-$200
used rough top conveyor belt -$136
Not too bad for $636 bucks.
I can do a cord in 1hour with ease so be the supply of wood is right behind me.
My neighbors are always facinated with what Im building next. I live in a pretty nice neighborhood 10 min from downtown sandiego surprized they don't hate me, free wood is always a good peace offering
[video=youtube;LtluSVAlFR8]http://www.youtube.com/watch?v=LtluSVAlFR8[/video]