mount the bar on the saw and run a string around it and the drive sprocket just like it was the chain, then lay the string next to the right pitch chain and use it to "calibrate" the string with length between drive links. Do it with the bar mounted in both extreme positions of the slot and you should get a good idea of correct DL count.