I feel like I've seen this before on a thread but I'll them out I'm thinking of using 1 inch schedule 40 conduit to finish my roof off. I work with pvc every day so I have a feel for it.
That's what I do. Everything is stacked outside in open air from whenever I split and stack until the very beginning of the season I plan to burn it. Then I move about a cord at a time into my barn, which keeps it out of the weather until it's time to load the stove. Works for me.I'm in the same boat. Need to build one this summer now that our house is built. So many ideas on Pinterest it's overwhelming. Want to build one to hold 4 maybe 5 cord. How do you guys feel about letting it air dry for several months and then in August put it in the shed?
Sent from my iPhone using Tapatalk
Enter your email address to join: