You read my mind! I plan to pull my water from the top port in the rear of the boiler and run a pipe along the top to the front, where I will drill a hole in the top and weld in a flange. My returning water will be forced onto the hottest part of the boiler. I would like to weld the cover in the back shut too, because it's a pain in the ass. My cover is very warped, I'm missing the center tab of steel on the water jacket, and there is barely enough lip to seal. If I didn't have the water coil, I'd weld the cover up, and either cap the vent on the side, or 90* it and run a hard line up above the top of the water jacket. I bet I'd fit 20 gallons more water in there. Maybe I'll junk the coil and do it, I haven't hooked the coil up yet anyway.[/QUOTE\\
I refuse to go through another winter with that water steaming, water leaking excuse for a bad word I can't say right now.
Plant managers in China can get shot for shoddy workmanship like that.
I plan to do something to help with circulation over the summer, the extra twenty gal. water sounds like a plan.I may move the intake for the pump up a little higher.Up closer to the hotter water.